mirror of
https://github.com/J3vb/OwnCord.git
synced 2026-09-03 03:50:00 +03:00
docs(hp-2): accepted 2026-08-29 by the owner; B2 complete, B3 next (#1446)
This commit is contained in:
+13
-13
@@ -10,19 +10,19 @@ authority**.
|
||||
|
||||
## Active — these drive current work
|
||||
|
||||
| Plan | State |
|
||||
| ----------------------------------------------------------------------------------------- | -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
|
||||
| [beta-product-requirements-2026-08-23](beta-product-requirements-2026-08-23.md) | Approved beta scope, frozen. 57 `BPR-*` requirements. |
|
||||
| [repo-health-roadmap-2026-08-23](repo-health-roadmap-2026-08-23.md) | Phase order and gates, B0–B10. **B0 and B1 complete** (HP-0 and HP-1 both accepted); **B2 in progress** — plan below. B3–B10 not started. **Amended 2026-08-28:** dated lines in B3–B10, a "Phase execution pattern" section, and a truthful status header. **Amended 2026-08-29:** B3/B7/B9 lines binding the layout-refactor supplement below; current slice updated for B2-2. |
|
||||
| [repo-health-issue-register-2026-08-23](repo-health-issue-register-2026-08-23.md) | 88 planning rows. Public-safe; not a replacement for the ledger. |
|
||||
| [beta-requirements-traceability-2026-08-23](beta-requirements-traceability-2026-08-23.md) | Requirement → phase → evidence map. No row is release-qualified. |
|
||||
| [b0-baseline-2026-08-25](b0-baseline-2026-08-25.md) | **Supersedes the roadmap's "current evidence snapshot."** B0 measurements and dispositions. |
|
||||
| [b1-repository-foundation-2026-08-25](b1-repository-foundation-2026-08-25.md) | **B1-0 through B1-8 all done.** B1 execution plan. Re-verifies every RL-\* claim against HEAD; several are refuted. |
|
||||
| [hp-0-scorecard-2026-08-25](hp-0-scorecard-2026-08-25.md) | **HP-0 accepted 2026-08-25.** The single baseline-acceptance artifact. Part-closes `R-08`. |
|
||||
| [hp-1-scorecard-2026-08-27](hp-1-scorecard-2026-08-27.md) | **HP-1 accepted 2026-08-27.** Structural-diff proofs for the flatten and module rename, plus the B1 exit gate. |
|
||||
| [b2-protocol-trust-compat-2026-08-28](b2-protocol-trust-compat-2026-08-28.md) | **B2 execution complete 2026-08-29, pending HP-2 signature.** B2-0, B2-1, B2-8 done 2026-08-28; B2-2 (B2-3/B2-4 folded in), B2-5, B2-6, B2-7, B2-9 done 2026-08-29. Scorecard below. |
|
||||
| [hp-2-scorecard-2026-08-29](hp-2-scorecard-2026-08-29.md) | **HP-2 awaiting owner signature (written 2026-08-29).** Seven questions answered with commands; B2 exit gate, nine conditions; one E2EE gap recorded and disclaimed. Owner fills the reader, review and signature lines. |
|
||||
| [audit-2026-08-19-remediation](audit-2026-08-19-remediation.md) | Phases 1–6 done 2026-08-20; **phase 7 pending**. Its header still reads "in progress 2026-08-19" — stale; the phase table is correct. |
|
||||
| Plan | State |
|
||||
| ----------------------------------------------------------------------------------------- | --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
|
||||
| [beta-product-requirements-2026-08-23](beta-product-requirements-2026-08-23.md) | Approved beta scope, frozen. 57 `BPR-*` requirements. |
|
||||
| [repo-health-roadmap-2026-08-23](repo-health-roadmap-2026-08-23.md) | Phase order and gates, B0–B10. **B0, B1 and B2 complete** (HP-0, HP-1 and HP-2 all accepted); **B3 is next** — opens with the layout-refactor first slice. B3–B10 not started. **Amended 2026-08-28:** dated lines in B3–B10, a "Phase execution pattern" section, and a truthful status header. **Amended 2026-08-29:** B3/B7/B9 lines binding the layout-refactor supplement below; current slice updated for B2-2. |
|
||||
| [repo-health-issue-register-2026-08-23](repo-health-issue-register-2026-08-23.md) | 88 planning rows. Public-safe; not a replacement for the ledger. |
|
||||
| [beta-requirements-traceability-2026-08-23](beta-requirements-traceability-2026-08-23.md) | Requirement → phase → evidence map. No row is release-qualified. |
|
||||
| [b0-baseline-2026-08-25](b0-baseline-2026-08-25.md) | **Supersedes the roadmap's "current evidence snapshot."** B0 measurements and dispositions. |
|
||||
| [b1-repository-foundation-2026-08-25](b1-repository-foundation-2026-08-25.md) | **B1-0 through B1-8 all done.** B1 execution plan. Re-verifies every RL-\* claim against HEAD; several are refuted. |
|
||||
| [hp-0-scorecard-2026-08-25](hp-0-scorecard-2026-08-25.md) | **HP-0 accepted 2026-08-25.** The single baseline-acceptance artifact. Part-closes `R-08`. |
|
||||
| [hp-1-scorecard-2026-08-27](hp-1-scorecard-2026-08-27.md) | **HP-1 accepted 2026-08-27.** Structural-diff proofs for the flatten and module rename, plus the B1 exit gate. |
|
||||
| [b2-protocol-trust-compat-2026-08-28](b2-protocol-trust-compat-2026-08-28.md) | **B2 complete — HP-2 accepted 2026-08-29.** B2-0, B2-1, B2-8 done 2026-08-28; B2-2 (B2-3/B2-4 folded in), B2-5, B2-6, B2-7, B2-9 done 2026-08-29. Scorecard below. |
|
||||
| [hp-2-scorecard-2026-08-29](hp-2-scorecard-2026-08-29.md) | **HP-2 accepted 2026-08-29.** Seven questions answered with commands; B2 exit gate, nine conditions met (1 at the slim epoch scope, 4 with one E2EE gap disclaimed). Owner follow-ups that do not gate B3: BPR-051 reader line, SEC-01/SEC-04 advisory IDs. |
|
||||
| [audit-2026-08-19-remediation](audit-2026-08-19-remediation.md) | Phases 1–6 done 2026-08-20; **phase 7 pending**. Its header still reads "in progress 2026-08-19" — stale; the phase table is correct. |
|
||||
|
||||
## Partially implemented
|
||||
|
||||
|
||||
@@ -5,7 +5,7 @@
|
||||
`v1.2.0-alpha.4` — claims verified at `64d2e108`; the branch was rebased
|
||||
onto `dd7ed091` (#1432) before merge
|
||||
**Status:** in progress — entry gate 1 of 3 met at draft time (see below); B2-0,
|
||||
B2-1 and B2-8 landed 2026-08-28, B2-2 (with B2-3 and B2-4 folded in) and B2-5 on 2026-08-29 (evidence in their sections); B2-6 landed 2026-08-29 (PR #1441); B2-7 landed 2026-08-29 (PR #1443 = `88c7a824`); B2-9 done and the HP-2 scorecard written 2026-08-29, in review — **HP-2 awaits the owner's signature** ([hp-2-scorecard-2026-08-29.md](hp-2-scorecard-2026-08-29.md)).
|
||||
B2-1 and B2-8 landed 2026-08-28, B2-2 (with B2-3 and B2-4 folded in) and B2-5 on 2026-08-29 (evidence in their sections); B2-6 landed 2026-08-29 (PR #1441); B2-7 landed 2026-08-29 (PR #1443 = `88c7a824`); B2-9 done 2026-08-29 (PR #1444 = `2bfc5e30`); **HP-2 accepted 2026-08-29** ([hp-2-scorecard-2026-08-29.md](hp-2-scorecard-2026-08-29.md)) — **B2 is complete, B3 may begin.**
|
||||
Update this line, not only the step table, when a step lands.
|
||||
|
||||
Primary inputs:
|
||||
@@ -46,7 +46,7 @@ one to one and a half weeks with agents working steps in parallel.
|
||||
| **B2-7** | Trust model, absence proofs, plugin boundary — **DONE 2026-08-29 (PR #1443)** | 1 day | B2-1, B2-6 |
|
||||
| **B2-8** | The nine B2-tagged findings — **DONE 2026-08-28 (PR #1436)** | 1 day | before B2-2 |
|
||||
| **B2-9** | Security owners and acceptance tests — **DONE 2026-08-29** (SEC-03 → B5; table closed) | spread | — |
|
||||
| **HP-2** | Protocol and threat-model sign-off — **scorecard written 2026-08-29, awaiting signature** | — | — |
|
||||
| **HP-2** | Protocol and threat-model sign-off — **ACCEPTED 2026-08-29** | — | — |
|
||||
|
||||
Order: B2-0, B2-1, B2-8, then B2-2 → B2-3 → B2-4; B2-5 is serialized on its
|
||||
own; B2-6, B2-7 and B2-9 run in parallel where the table allows.
|
||||
|
||||
@@ -11,7 +11,15 @@ the B2-9/HP-2 branch (table below)
|
||||
(every B2-_n_ evidence block), [hp-1-scorecard-2026-08-27.md](hp-1-scorecard-2026-08-27.md)
|
||||
(open items carried in)
|
||||
|
||||
**Decision: \_\_\_\_ — 2026-08-\_\_ by J3vb (repository owner).**
|
||||
**Decision: ACCEPTED — 2026-08-29 by J3vb (repository owner).**
|
||||
|
||||
All nine exit conditions are evidenced below. Condition 1 is accepted **at
|
||||
the slim one-epoch scope** the owner chose for B2-2; condition 4 is accepted
|
||||
**with the first-contact membership gap recorded and disclaimed**, not fixed
|
||||
— it stays under "What beta does not claim" (Question 4's recommendation,
|
||||
taken). The BPR-051 non-developer read (Question 3) and the SEC-01/SEC-04
|
||||
advisory IDs (B2-9 block) remain owner follow-ups and do not gate B3.
|
||||
**B2 is complete and B3 may begin.**
|
||||
|
||||
HP-2 asks seven questions. Each is answered below with the command that
|
||||
produces the evidence and what it printed on the measured tree, not with an
|
||||
@@ -170,7 +178,8 @@ fixed in the document (B2-7 evidence block).
|
||||
|
||||
The human half:
|
||||
|
||||
- **Owner review** of `docs/trust-model.md` at `88c7a824`: **\_\_\_\_** (date).
|
||||
- **Owner review** of `docs/trust-model.md` at `88c7a824`: 2026-08-29, with
|
||||
the acceptance of this scorecard.
|
||||
- **Non-developer read** of "The short answer" — BPR-051's exit evidence.
|
||||
Reader: **\_\_\_\_**. Date: **\_\_\_\_**. Answer given to "who can read my
|
||||
messages?": **\_\_\_\_**. (Quoted from the B2-7 evidence block, where the
|
||||
@@ -451,4 +460,5 @@ Accepting HP-2 authorises B3 to begin. It does **not** claim:
|
||||
- that the deferred security rows are fixed — they are owned and scheduled
|
||||
(B2-9 table), not resolved.
|
||||
|
||||
**Signed:** **\_\_\_\_** (J3vb, repository owner), 2026-08-\_\_.
|
||||
**Signed:** J3vb (repository owner), 2026-08-29 — accepted in session, recorded
|
||||
by this commit.
|
||||
|
||||
@@ -3,9 +3,9 @@
|
||||
**Prepared:** 2026-08-23
|
||||
**Audited head:** 5cc0888964e26276d1aca145e83270a2c1b9febd on dev
|
||||
**Release target:** first public beta after the 1.2.0-alpha line
|
||||
**Status:** B0 and B1 complete (HP-0 accepted 2026-08-25, HP-1 accepted
|
||||
2026-08-27); B2 in progress from
|
||||
[b2-protocol-trust-compat-2026-08-28.md](b2-protocol-trust-compat-2026-08-28.md);
|
||||
**Status:** B0, B1 and B2 complete (HP-0 accepted 2026-08-25, HP-1 accepted
|
||||
2026-08-27, HP-2 accepted 2026-08-29 —
|
||||
[hp-2-scorecard-2026-08-29.md](hp-2-scorecard-2026-08-29.md)); B3 is next;
|
||||
B3–B10 not started. Amended 2026-08-28 — see the `_(added 2026-08-28)_` lines
|
||||
in B3–B10 and the "Phase execution pattern" section. Amended 2026-08-29 —
|
||||
[developer-experience-layout-refactor-2026-08-29.md](developer-experience-layout-refactor-2026-08-29.md)
|
||||
@@ -1247,9 +1247,9 @@ in this order:
|
||||
`9c9b8be6`;
|
||||
5. B2-5 (PR #1440 = `67fdd18d`), B2-6 (PR #1441 = `2b2d58ab`), B2-7
|
||||
(PR #1443 = `88c7a824`) and B2-9 — **done 2026-08-29**;
|
||||
6. HP-2 — scorecard written 2026-08-29
|
||||
([hp-2-scorecard-2026-08-29.md](hp-2-scorecard-2026-08-29.md)),
|
||||
**awaiting the owner's signature**.
|
||||
6. HP-2 — **accepted 2026-08-29**
|
||||
([hp-2-scorecard-2026-08-29.md](hp-2-scorecard-2026-08-29.md)); B2 is
|
||||
closed and B3 opens as described below.
|
||||
|
||||
Do not begin B3 domain extraction, client platform extraction, or browser work
|
||||
before HP-2 closes. When it does, B3 opens with the "First actionable slice"
|
||||
|
||||
Reference in New Issue
Block a user