docs: B2 execution plan and the 2026-08-28 roadmap amendments (#1433)
* docs(roadmap): record B0/B1 complete and point B2 at its execution plan * docs(roadmap): keep the hard break after the status header * docs(roadmap): write down the phase execution pattern B0 and B1 proved * docs(roadmap): add the 2026-08-28 amendments to B3-B10 * docs(plans): add the B2 execution plan * docs(plans): index the B2 plan and the roadmap amendment * docs(plans): record that the owner already synced dev after alpha.4 (#1432) * docs(plans): apply the final review — verify three claims, serialize B2-5, add the step table Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> * docs(plans): do not point readers at a public repro from the B2-9 table --------- Co-authored-by: Claude Fable 5 <noreply@anthropic.com>
This commit is contained in:
+12
-11
@@ -10,17 +10,18 @@ authority**.
|
||||
|
||||
## Active — these drive current work
|
||||
|
||||
| Plan | State |
|
||||
| ----------------------------------------------------------------------------------------- | ------------------------------------------------------------------------------------------------------------------------------------- |
|
||||
| [beta-product-requirements-2026-08-23](beta-product-requirements-2026-08-23.md) | Approved beta scope, frozen. 57 `BPR-*` requirements. |
|
||||
| [repo-health-roadmap-2026-08-23](repo-health-roadmap-2026-08-23.md) | Phase order and gates, B0–B10. **B0 and B1 complete** (HP-0 and HP-1 both accepted); B2 next. B3–B10 not started. |
|
||||
| [repo-health-issue-register-2026-08-23](repo-health-issue-register-2026-08-23.md) | 88 planning rows. Public-safe; not a replacement for the ledger. |
|
||||
| [beta-requirements-traceability-2026-08-23](beta-requirements-traceability-2026-08-23.md) | Requirement → phase → evidence map. No row is release-qualified. |
|
||||
| [b0-baseline-2026-08-25](b0-baseline-2026-08-25.md) | **Supersedes the roadmap's "current evidence snapshot."** B0 measurements and dispositions. |
|
||||
| [b1-repository-foundation-2026-08-25](b1-repository-foundation-2026-08-25.md) | **B1-0 through B1-8 all done.** B1 execution plan. Re-verifies every RL-\* claim against HEAD; several are refuted. |
|
||||
| [hp-0-scorecard-2026-08-25](hp-0-scorecard-2026-08-25.md) | **HP-0 accepted 2026-08-25.** The single baseline-acceptance artifact. Part-closes `R-08`. |
|
||||
| [hp-1-scorecard-2026-08-27](hp-1-scorecard-2026-08-27.md) | **HP-1 accepted 2026-08-27.** Structural-diff proofs for the flatten and module rename, plus the B1 exit gate. |
|
||||
| [audit-2026-08-19-remediation](audit-2026-08-19-remediation.md) | Phases 1–6 done 2026-08-20; **phase 7 pending**. Its header still reads "in progress 2026-08-19" — stale; the phase table is correct. |
|
||||
| Plan | State |
|
||||
| ----------------------------------------------------------------------------------------- | ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
|
||||
| [beta-product-requirements-2026-08-23](beta-product-requirements-2026-08-23.md) | Approved beta scope, frozen. 57 `BPR-*` requirements. |
|
||||
| [repo-health-roadmap-2026-08-23](repo-health-roadmap-2026-08-23.md) | Phase order and gates, B0–B10. **B0 and B1 complete** (HP-0 and HP-1 both accepted); **B2 in progress** — plan below. B3–B10 not started. **Amended 2026-08-28:** dated lines in B3–B10, a "Phase execution pattern" section, and a truthful status header. |
|
||||
| [repo-health-issue-register-2026-08-23](repo-health-issue-register-2026-08-23.md) | 88 planning rows. Public-safe; not a replacement for the ledger. |
|
||||
| [beta-requirements-traceability-2026-08-23](beta-requirements-traceability-2026-08-23.md) | Requirement → phase → evidence map. No row is release-qualified. |
|
||||
| [b0-baseline-2026-08-25](b0-baseline-2026-08-25.md) | **Supersedes the roadmap's "current evidence snapshot."** B0 measurements and dispositions. |
|
||||
| [b1-repository-foundation-2026-08-25](b1-repository-foundation-2026-08-25.md) | **B1-0 through B1-8 all done.** B1 execution plan. Re-verifies every RL-\* claim against HEAD; several are refuted. |
|
||||
| [hp-0-scorecard-2026-08-25](hp-0-scorecard-2026-08-25.md) | **HP-0 accepted 2026-08-25.** The single baseline-acceptance artifact. Part-closes `R-08`. |
|
||||
| [hp-1-scorecard-2026-08-27](hp-1-scorecard-2026-08-27.md) | **HP-1 accepted 2026-08-27.** Structural-diff proofs for the flatten and module rename, plus the B1 exit gate. |
|
||||
| [b2-protocol-trust-compat-2026-08-28](b2-protocol-trust-compat-2026-08-28.md) | **B2 in progress from 2026-08-28.** Entry gate 1 of 3 met at draft; B2-1 and B2-9 close the other two. Step order: B2-0, B2-1, B2-8, then B2-2 → B2-3 → B2-4, with B2-6/7/9 in parallel and B2-5 serialized. Ends at HP-2. |
|
||||
| [audit-2026-08-19-remediation](audit-2026-08-19-remediation.md) | Phases 1–6 done 2026-08-20; **phase 7 pending**. Its header still reads "in progress 2026-08-19" — stale; the phase table is correct. |
|
||||
|
||||
## Partially implemented
|
||||
|
||||
|
||||
@@ -0,0 +1,455 @@
|
||||
# B2 — Freeze server protocol, trust, and compatibility contracts
|
||||
|
||||
**Drafted:** 2026-08-28
|
||||
**Base commit:** `64d2e108` (`dev`, post-PR #1425); `main` @ `b7d388a3` =
|
||||
`v1.2.0-alpha.4` — claims verified at `64d2e108`; the branch was rebased
|
||||
onto `dd7ed091` (#1432) before merge
|
||||
**Status:** in progress — entry gate 1 of 3 met at draft time (see below); B2-0
|
||||
is the first step. Update this line, not only the step table, when a step
|
||||
lands.
|
||||
|
||||
Primary inputs:
|
||||
|
||||
- [beta roadmap](repo-health-roadmap-2026-08-23.md), B2 section and HP-2
|
||||
- [HP-1 scorecard](hp-1-scorecard-2026-08-27.md), "Hand-off to B2" and "Open
|
||||
items carried past B1"
|
||||
- [issue register](repo-health-issue-register-2026-08-23.md) — every row
|
||||
tagged `B2`
|
||||
- [requirement traceability](beta-requirements-traceability-2026-08-23.md) —
|
||||
BPR-031, 032, 040, 050, 051, 080–083
|
||||
|
||||
## Context
|
||||
|
||||
B1 made the repository discoverable and gave the protocol one owner
|
||||
(`protocol/schema.json`). It changed no behaviour. B2 is the first phase that
|
||||
does: it freezes the contracts every later server service and every client
|
||||
must obey — the protocol epoch, the update order, the trust model, the
|
||||
permission predicates, the audit surface, and the boundary of what beta does
|
||||
not promise (plugins, federation, a directory).
|
||||
|
||||
The owner's decision on 2026-08-28: execute B2 as written rather than cut the
|
||||
roadmap to ship sooner. BPR-002 (no deadline) and BPR-003 (frozen scope)
|
||||
stand. Sizes below are personal estimates and never a gate; the honest total is
|
||||
one to one and a half weeks with agents working steps in parallel.
|
||||
|
||||
## Steps at a glance
|
||||
|
||||
| Step | What | Size | Parallel with |
|
||||
| -------- | -------------------------------------------------------------------------------------------------- | -------- | ---------------------- |
|
||||
| **B2-0** | Alpha.4 verified; `dev` synced (done, #1432); `environment: release`; ENV-03; `dev` `strict: true` | hours | — |
|
||||
| **B2-1** | Capture the epoch-1 fixtures; retire `voice_speakers` and `member_leave` | 1 day | B2-6, B2-7 |
|
||||
| **B2-2** | Protocol epoch and negotiation | 1 day | serialized, after B2-8 |
|
||||
| **B2-3** | Server-first updates through the signed manifest | ½ day | after B2-2 |
|
||||
| **B2-4** | Compatibility matrix | ½ day | after B2-2 |
|
||||
| **B2-5** | One permission predicate per security property | 1–2 days | serialized |
|
||||
| **B2-6** | Safe audit coverage | ½ day | B2-1, B2-7 |
|
||||
| **B2-7** | Trust model, absence proofs, plugin boundary | 1 day | B2-1, B2-6 |
|
||||
| **B2-8** | The nine B2-tagged findings | 1 day | before B2-2 |
|
||||
| **B2-9** | Security owners and acceptance tests | spread | — |
|
||||
| **HP-2** | Protocol and threat-model sign-off | — | — |
|
||||
|
||||
Order: B2-0, B2-1, B2-8, then B2-2 → B2-3 → B2-4; B2-5 is serialized on its
|
||||
own; B2-6, B2-7 and B2-9 run in parallel where the table allows.
|
||||
|
||||
## Entry gate
|
||||
|
||||
| Condition | State 2026-08-28 |
|
||||
| -------------------------------------------------------------------- | ------------------------------------------------------------------------------------------------------------------------------------- |
|
||||
| B1 complete; protocol source has one owner | **Met.** HP-1 accepted 2026-08-27; `protocol/schema.json` generates both consumers from `npm run generate`. |
|
||||
| Confirmed security findings have private owners and acceptance tests | **B2-9.** Seven local reports under the gitignored `docs/security-findings/`, each already mapped to a public row (HP-0, question 4). |
|
||||
| Alpha protocol fixtures and updater contracts are captured | **B2-1.** Must land before any protocol change — alpha.4 is the last client that speaks the pre-epoch wire, and it is live now. |
|
||||
|
||||
## What B1 carried over that B2-0 closes
|
||||
|
||||
| Item | State | B2-0 action |
|
||||
| ------------------------------------------- | --------------------------------------------------------------------------------------------------------------------------------------- | ------------------------------------------ |
|
||||
| `dev` `strict: false` (B1 exit condition 6) | 12 checks pinned; a PR can still merge without re-testing against a moved base | Flip to `true` — owner approved 2026-08-28 |
|
||||
| `environment: release` absent from workflow | The `release` environment exists (1 reviewer) but `release.yml` does not name it, so the reviewer gate never fires | Add it to the publishing job |
|
||||
| ENV-03 `MSYS_NO_PATHCONV` | `Server/scripts/docker-smoke.sh` still needs the variable set by the caller; Git Bash on Windows otherwise reports a false boot failure | Export it inside the script |
|
||||
|
||||
## Verify before you implement
|
||||
|
||||
Every claim the roadmap's B2 section rests on, re-tested against `64d2e108`.
|
||||
|
||||
| Claim | Verdict | What it means for the work |
|
||||
| --------------------------------------------- | --------------------------- | ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ |
|
||||
| No protocol epoch exists | **Confirmed** | `protocol/schema.json` has `"version": 1` — the schema _format_, read by `Server/cmd/genprotocol/main.go:35`. The `auth` payload (`Server/ws/serve_auth.go:46-52`) is `token`, `last_seq`, `active_channel_id`. Nothing carries a version. |
|
||||
| The client has no "update required" path | **Half refuted** | `Client/src/lib/ws.ts:306-314` already treats `auth_error` as non-recoverable: sets `intentionalClose`, dispatches, disconnects. So a rejected client **does not** loop today. B2-2 rides that path and pins it with a test; it does not build a new one. |
|
||||
| The update endpoint ignores compatibility | **Confirmed** | `Server/api/client_update.go:34` advertises the newest GitHub release for the target. The signed manifest (`Server/updater/verify.go:29`) has `version`, `asset`, `sha256`, `assets` — no epoch. |
|
||||
| WASM is disabled by default | **Confirmed, already done** | `Server/config/config.go` (plugins `Enabled` defaults false; the example config says "Disabled by default"). B2-7 adds wording only. |
|
||||
| Reserved entries with no sender (S-15) | **Confirmed** | `protocol/schema.json:65` `voice_speakers`, `:75` `member_leave`. No production emit site in `Server/`. |
|
||||
| L-08 prebuilt WASM still tracked | **Refuted** | Deleted in #1418; `.gitignore` ignores it; the example's README documents the build. Only the deterministic-build gate remains, and it is blocked (B1 plan). B2-7 item 4 is that decision, not the untracking. |
|
||||
| Audit events exist | **Confirmed** | `Server/db/audit_writer.go` (async batched writer, drops are logged); the `WriteAudit(`, `LogAudit(` and `EnqueueAudit(` call sites (a grep for `Audit(` catches all three). Invite create/revoke have none (S-02). |
|
||||
| Permission helpers exist but are mirrored | **Confirmed** | `Server/permissions/permissions.go`: `HasPerm`, `HasAnyPerm`, `HasAdmin`, `HasServerPerm`, `EffectivePerms`, `EffectiveChannelPerms`. Typing checks a weaker permission than posting (S-01); ready/refresh/ws mirror send policy by hand (S-12). |
|
||||
| Trust model has one document | **Refuted** | Pieces live in `docs/protocol.md`, `docs/architecture/voice-e2ee.md`, `docs/credential-storage.md`, `docs/security.md`. No single statement of what the operator can read. |
|
||||
| Federation / directory / central identity | **Absent, unproven** | Nothing exists. B2-7 turns "nothing" into a test that fails if something appears. |
|
||||
| WS application close codes in use | **Refuted** | None. Non-test code closes only with the library's 1000/1011. The `4000`/`4096` grep hits are unrelated constants (`CONFIRM_TIMEOUT_MS`, `maxMessageLen`, `Vec::with_capacity`, `touchThrottleMaxEntries`). `4426` will be the first application close code. |
|
||||
| CI needs a new job for the compatibility test | **Refuted** | A Go table test runs under `go test ./...`, which the required `Server Build & Test` check already executes. No new job, no pin-script change for B2-4. |
|
||||
|
||||
Net effect: B2-2 is smaller than the roadmap implies (the rejection path
|
||||
exists), B2-4 needs no CI change, and the trust-model document is a genuine
|
||||
gap.
|
||||
|
||||
## B2-0 — Alpha.4 out the door, `dev` synced, release hygiene
|
||||
|
||||
Done in this order; the tag is already pushed.
|
||||
|
||||
1. **Verify the release.** Run `33144028968` completed `success` 2026-08-28
|
||||
05:23 UTC. `gh release view v1.2.0-alpha.4 --json assets --jq '.assets|length'`
|
||||
→ **20**, the same set alpha.3 shipped: server binary + archive + `.sig` +
|
||||
`checksums.sha256` + source snapshot + signed `server-update-manifest.json`,
|
||||
plus the AppImage/deb/NSIS client assets and their signatures. The
|
||||
workflow's own `Verify signed assets against pinned server update key` step
|
||||
passed inside that run. Record the asset list in HP-2 as the pre-epoch
|
||||
updater contract.
|
||||
2. **Sync `dev`.** **Done 2026-08-28 by the owner** — #1432 "merge main into
|
||||
dev after the v1.2.0-alpha.4 release" (`dd7ed091`), the same shape as #1425.
|
||||
`main` was 5 ahead of `dev` before it. **Known trap, still live:**
|
||||
squash-merging a sync PR re-diverges `dev` from `main` by content-identical
|
||||
commits; the next release PR then shows phantom conflicts and is unblocked
|
||||
by creating `release/<tag>` with `git merge --no-ff main` (how alpha.4
|
||||
itself was unblocked). Accept the trap; it is cheaper than changing the
|
||||
merge model mid-phase.
|
||||
3. **`environment: release`.** In `.github/workflows/release.yml`, add
|
||||
`environment: release` at job level on the `publish` job (its header is
|
||||
near line 490 of `release.yml`; the "Generate server update manifest" and
|
||||
signing steps live inside it). The environment
|
||||
exists with one reviewer, so the next tag waits for approval. Verify with
|
||||
`actionlint` (the hygiene job runs it in CI; locally it may be absent on
|
||||
Windows — CI is the gate).
|
||||
4. **ENV-03.** Add `export MSYS_NO_PATHCONV=1` near the top of
|
||||
`Server/scripts/docker-smoke.sh`. Verify: on Git Bash, build and run the
|
||||
smoke **without** setting the variable in the shell —
|
||||
`docker build --build-arg VERSION=ci -t owncord-smoke:candidate Server/ && bash Server/scripts/docker-smoke.sh owncord-smoke:candidate`
|
||||
exits 0. Remember the build context is `Server/`, not the root.
|
||||
5. **`dev` strict.** Edit `docs/plans/b0-dev-branch-protection.sh` line 63,
|
||||
`"strict": false,` → `"strict": true,`, run it
|
||||
(`bash docs/plans/b0-dev-branch-protection.sh`), and read back:
|
||||
`gh api repos/J3vb/OwnCord/branches/dev/protection --jq '.required_status_checks.strict'`
|
||||
→ `true`. Repository-settings writes need a person; the owner approved this
|
||||
one on 2026-08-28. Record the read-back in HP-2.
|
||||
|
||||
Items 3–5 are one PR (`chore(b2-0): release hygiene`). Item 2 landed as
|
||||
#1432. Item 1 is evidence, not a change.
|
||||
|
||||
## B2-1 — Capture the epoch-1 fixtures
|
||||
|
||||
Lands **before** B2-2. Alpha.4 is the last client on the pre-epoch wire; once
|
||||
B2-2 merges there is no clean way to record what "epoch 0/1" looked like.
|
||||
|
||||
1. **Golden wire transcripts.** A contract test in `Server/ws`
|
||||
(`protocol_epoch1_contract_test.go`, matching the existing
|
||||
`*_contract_test.go` tier) drives the required journeys through the
|
||||
in-process hub harness the package's tests already use (reuse it — do not
|
||||
write a second harness) and compares each journey's frame sequence with a
|
||||
JSON file under `protocol/fixtures/epoch-1/`. Journeys: fresh connect
|
||||
(`auth` → `auth_ok` → `ready`); resume with `last_seq` and a replay burst;
|
||||
`chat_send` and its fan-out; edit and delete; reaction add/remove; typing;
|
||||
`mark_read`; DM send; `voice_join` → `voice_state`, `voice_e2ee_announce`
|
||||
and `voice_e2ee_offer` relay, `voice_leave`; `ping`; failed auth
|
||||
(`auth_error`). Volatile fields (`id`, `seq`, timestamps, tokens, user ids)
|
||||
are normalised to stable placeholders before comparison, which is what lets
|
||||
the fixtures survive refactors. `go test ./ws -run TestEpoch1Fixtures -update`
|
||||
regenerates; the default run compares.
|
||||
2. **Client side of the same contract.** `Client/tests/contract/ws-auth-frame.test.ts`
|
||||
pins the `auth` frame `Client/src/lib/ws.ts:447` sends today (`token`,
|
||||
`last_seq`, optional `active_channel_id`). B2-2 extends this test rather
|
||||
than replacing it.
|
||||
3. **Updater contract.** Before B2-3 changes them, assert the current shapes:
|
||||
the manifest fields in `Server/updater/release_manifest_test.go`, and the
|
||||
`client-update` 200/204 bodies in the handler's test next to
|
||||
`Server/api/client_update.go`.
|
||||
4. **Retire the reserved entries (S-15).** Remove `voice_speakers` and
|
||||
`member_leave` from `protocol/schema.json` via the `protocol-change` skill
|
||||
(`npm run generate`, then `git grep -nE 'VOICE_SPEAKERS|MEMBER_LEAVE|MsgTypeVoiceSpeakers|MsgTypeMemberLeave'`
|
||||
must return only the generated files' history, i.e. nothing at HEAD), and
|
||||
delete their rows from `docs/protocol.md`. Own commit, before the fixtures
|
||||
are captured, so epoch 1 does not carry dead entries.
|
||||
5. **Document the fixtures** in `protocol/README.md`: what a fixture is, how to
|
||||
regenerate, and the rule that a fixture may only change with an epoch bump.
|
||||
|
||||
Verification: `npm run check:server` (regenerates and diffs both generators;
|
||||
runs the new test under `go test ./...`), `npm run check:client`.
|
||||
|
||||
## B2-2 — Protocol epoch and negotiation
|
||||
|
||||
Design fixed 2026-08-28; the numbers and names below are the contract.
|
||||
|
||||
1. **One number, generated.** `protocol/schema.json` gains
|
||||
`"protocol_epoch": 1` beside `"version": 1` (schema format stays 1).
|
||||
`Server/cmd/genprotocol/main.go` reads it (`ProtocolEpoch int` on the schema
|
||||
struct at lines 34–37) and emits `const ProtocolEpoch = 1` into
|
||||
`Server/ws/message_types.go` and `export const PROTOCOL_EPOCH = 1` into
|
||||
`Client/src/lib/protocolTypes.ts`. Follow the `protocol-change` skill; the
|
||||
drift gate covers both outputs. Own commit.
|
||||
2. **Handshake, server.** In `Server/ws/serve_auth.go` the auth payload gains
|
||||
`` Epoch int `json:"epoch"` `` and `` ClientVersion string `json:"client_version"` ``.
|
||||
Rule, with N = `ProtocolEpoch`: absent → 0; accept when
|
||||
`max(0, N-2) ≤ epoch ≤ N`; otherwise `buildAuthError`
|
||||
(`Server/ws/messages.go:368`) with `code: "protocol_epoch_unsupported"`,
|
||||
`server_epoch`, `min_epoch`, `update_url` (the server's own
|
||||
`/api/v1/client-update` origin), then close with code **4426**. A client
|
||||
newer than the server gets the same frame. `ready`
|
||||
(`Server/ws/serve_ready.go:361`) gains `protocol_epoch`. Table test over
|
||||
epoch ∈ {absent, N-3, N-2, N-1, N, N+1} in `Server/ws`.
|
||||
3. **Handshake, client.** `Client/src/lib/ws.ts:447` sends `epoch:
|
||||
PROTOCOL_EPOCH` and `client_version` (from the app metadata the settings
|
||||
Logs tab already reads). `AuthPayload`/`AuthErrorPayload` in
|
||||
`Client/src/lib/types.ts` gain the fields. On
|
||||
`code === "protocol_epoch_unsupported"` the dispatcher
|
||||
(`Client/src/lib/dispatcher.ts:293`) shows one plain line naming
|
||||
`server_epoch` and whether the client or the server is the older one; the
|
||||
existing non-recoverable path (`ws.ts:306`) already stops reconnecting —
|
||||
add the unit test that proves no reconnect timer is armed after the frame.
|
||||
Extend `Client/tests/contract/ws-auth-frame.test.ts` from B2-1.
|
||||
4. **`GET /api/v1/server-info`.** New unauthenticated handler beside
|
||||
`Server/api/client_update.go`, returning
|
||||
`{ "version", "protocol_epoch", "min_client_epoch" }`, rate-limited the way
|
||||
`client-update` is (`Server/api/constants.go:67`). Handler test; row in
|
||||
`docs/api.md`. B6 adds the browser-hosting flag here; B8 reads it.
|
||||
5. **`docs/protocol.md` § Compatibility** (new section) and a pointer in
|
||||
`protocol/README.md`: within an epoch changes are additive (new optional
|
||||
fields; new message types the other side may ignore — unknown server→client
|
||||
types are ignored, unknown client→server types get an `error` frame; both
|
||||
pinned by tests); a breaking change is a new epoch; the epoch-1 fixtures
|
||||
replay against the server for as long as epoch 1 is in the window, and a
|
||||
failing fixture means "bump the epoch", not "fix the fixture". An
|
||||
**obligations table** with dates, first row: the headerless E2EE key-offer
|
||||
blob (`docs/protocol.md` ~line 1235 today says "scheduled for removal in the
|
||||
next release") stays parseable until epoch 0 leaves the window, i.e. until
|
||||
N = 3. It is client↔client through a relay, so the server's epoch cannot
|
||||
police it; a written date does.
|
||||
6. **Scope of "negotiation".** Epoch only. No capability flags at beta; a
|
||||
client either speaks the epoch or it does not. The roadmap's "protocol
|
||||
changelog" is the obligations table above plus the `CHANGELOG.md` entry
|
||||
that ships the epoch.
|
||||
|
||||
Four commits (schema+generator; server; client; server-info+docs). Record the
|
||||
pre-squash SHAs in HP-2 — the fixture commit from B2-1 and the negotiation
|
||||
commits must be reviewable apart.
|
||||
|
||||
## B2-3 — Server-first updates
|
||||
|
||||
1. `releaseManifest` (`Server/updater/verify.go:29`) gains
|
||||
`` ProtocolEpoch int `json:"protocol_epoch,omitempty"` `` and
|
||||
`` ClientVersion string `json:"client_version,omitempty"` ``. A missing field
|
||||
is epoch 0.
|
||||
2. `.github/workflows/release.yml`, step "Generate server update manifest"
|
||||
(~line 568): write both fields, reading the epoch from
|
||||
`jq .protocol_epoch protocol/schema.json` so the workflow cannot drift from
|
||||
the generated constant.
|
||||
3. `Server/api/client_update.go`: before advertising a release, fetch and
|
||||
verify its manifest through the updater's existing signature path and
|
||||
require `manifest.ProtocolEpoch <= ws.ProtocolEpoch`; otherwise fall back
|
||||
to the newest compatible release; otherwise 204. Tests: newer-epoch
|
||||
candidate skipped → older compatible advertised → none → 204; unsigned or
|
||||
tampered manifest → candidate ignored.
|
||||
4. Docs: `docs/api.md` client-update section (the filter and the manifest
|
||||
fields); one paragraph "the server upgrades first" in `docs/deployment.md`;
|
||||
and the next tag line, `v1.2.0-beta.1`, recorded as the heading
|
||||
`CHANGELOG.md`'s next entry will use and in one sentence in
|
||||
`docs/contributing.md` (no release-procedure document exists today; do
|
||||
not create one for this).
|
||||
|
||||
## B2-4 — Compatibility matrix
|
||||
|
||||
Extend `Server/ws/protocol_epoch1_contract_test.go` from B2-1 into the matrix:
|
||||
for each client epoch in {absent, N-3, N-2, N-1, N, N+1} connect and, for
|
||||
accepted epochs, replay every epoch-1 fixture; for rejected ones, assert the
|
||||
`protocol_epoch_unsupported` frame and close code 4426. It runs under
|
||||
`go test ./...`, inside the required `Server Build & Test` check — **no new CI
|
||||
job and no pin-script change.** Exit evidence for BPR-032 and BG-07's server
|
||||
half.
|
||||
|
||||
## B2-5 — One permission predicate per security property
|
||||
|
||||
1. **Inventory.** `git grep -nE 'HasPerm|HasAnyPerm|HasServerPerm|EffectivePerms|EffectiveChannelPerms' Server/ -- ':!*_test.go'`
|
||||
plus every hand-rolled visibility/send check in `Server/ws` and
|
||||
`Server/service`. Table (file, line, property it decides) goes into the
|
||||
HP-2 scorecard.
|
||||
2. **Canonical predicates** in `Server/permissions`: value-taking functions,
|
||||
no database access — `CanViewChannel`, `CanSendMessage`, `CanType` (defined
|
||||
as `CanSendMessage`), `CanModerateVoice`, `CanJoinVoice`, `CanAdmitSession`
|
||||
— each over a small struct of role bits, channel overrides, channel flags,
|
||||
DM/block state.
|
||||
3. **Parity, then delegation.** For each predicate, a table test runs the old
|
||||
call site's logic and the new predicate over the same inputs and asserts
|
||||
equality; then the site delegates; then the old logic is deleted. One
|
||||
commit per property.
|
||||
4. **Closes:** S-01 (typing delegates to `CanSendMessage`), S-12
|
||||
(ready/refresh/ws delegate to `CanViewChannel`/`CanSendMessage`), and the
|
||||
server half of SEC-02 (voice moderation delegates to
|
||||
`CanModerateVoice`, which takes the channel override) — the specifics are
|
||||
in the local report `docs/security-findings/voice-moderation-channel-overrides/`.
|
||||
5. **Invariant rule candidate.** If, after migration, no file outside
|
||||
`Server/permissions` calls the bit helpers directly, add an
|
||||
`authz-chokepoint` rule to `Server/invariants` that fails on the first new
|
||||
one. If residual calls remain with a reason, record them in HP-2 and leave
|
||||
the rule to B3 (roadmap B3 item 15).
|
||||
|
||||
## B2-6 — Safe audit coverage
|
||||
|
||||
1. Enumerate the security-sensitive mutations: credential and TOTP changes,
|
||||
role assignment, invite create/revoke, ban/kick/timeout, channel permission
|
||||
edits, TLS/config changes, API-token create/revoke, plugin install,
|
||||
account/message deletion. Cross with `git grep -n 'Audit(' Server/ -- ':!*_test.go'`.
|
||||
2. A table test in the package that owns the handlers calls each mutation with
|
||||
a fake `db.AuditStore` and asserts an entry with the expected `action`
|
||||
arrives. Invite create/revoke fail first (S-02); add their `Audit` calls.
|
||||
3. A second table asserts `detail` never carries a token, password, recovery
|
||||
secret, or message body — a denylist over the recorded corpus. Fix any hit
|
||||
at the call site, never by loosening the list.
|
||||
|
||||
## B2-7 — Trust model, absence proofs, plugin boundary (documents)
|
||||
|
||||
Runs in parallel with B2-1 and B2-6.
|
||||
|
||||
1. **`docs/trust-model.md`** (new; BPR-050/051). Sections: what the server can
|
||||
read and why (text, files, metadata — delivery, search, moderation, backup);
|
||||
what is end-to-end encrypted (voice, video, screen share; the key-holder
|
||||
model and identity TOFU from `docs/architecture/voice-e2ee.md`; the server
|
||||
relays what it cannot read); transport (TLS modes; desktop certificate
|
||||
pinning; browser: publicly trusted or local-CA, no pinning); the desktop
|
||||
preview destination policy (C-09) — what the native boundary must own:
|
||||
resolution, redirects, destinations, time and body limits — stated as a
|
||||
contract so B7 implements it rather than rediscovers it; at rest (SQLite
|
||||
is not encrypted; secrets are hashed; desktop secrets in the OS keychain);
|
||||
what the operator can and cannot do; multi-device sessions; what beta does
|
||||
not claim. Linked from `docs/security.md`, `docs/deployment.md`,
|
||||
`docs/quick-start.md`, `docs/README.md`. Exit evidence for BPR-051 is one
|
||||
non-developer reading it and answering "who can read my messages?"
|
||||
correctly — record who and when in HP-2.
|
||||
2. **Absence proofs** (BPR-040/082/083). A contract test beside
|
||||
`Server/api/client_update.go` walks the mounted router and fails if any
|
||||
route matches `federat|directory|discover|listing`; a table in
|
||||
`trust-model.md` lists every outbound host the server contacts and why
|
||||
(GitHub for updates, LiveKit download, the existing preview/GIF/YouTube
|
||||
providers on user action) so B6's network capture has a checklist. Same
|
||||
username on two servers = two unrelated identities is already true; state it.
|
||||
3. **Plugin boundary** (BPR-080/081, BG-17). New
|
||||
`docs/architecture/plugins.md`, linked from `docs/architecture/server.md`
|
||||
and `docs/README.md`: WASM is experimental and disabled by default; no
|
||||
beta API promise; the post-beta candidate list (GIF/embed providers, slash
|
||||
commands and automation, webhooks, optional moderation automation with
|
||||
human authority retained, UI tabs, import/export bridges, observability
|
||||
exporters); the core list that never moves (authentication, authorization,
|
||||
TLS, safe fetch, quotas, E2EE, updates, deletion, recovery, moderation
|
||||
audit). Release-notes wording for beta goes in the same file.
|
||||
4. **L-08.** B1-6 (#1418) already untracked the prebuilt example WASM,
|
||||
ignores it in `.gitignore`, and documented the TinyGo build in
|
||||
`Server/plugin/examples/hello/README.md` (pinned TinyGo 0.40.1; rejects
|
||||
Go 1.26). What remains is the register's "deterministic source build
|
||||
passes" gate, which B1-6 found blocked on a second Go SDK. B2-7 decides
|
||||
one of two: a compile-and-compare job using a second Go SDK, or
|
||||
re-tagging the gate to B10 with the reason recorded in HP-2. Doing
|
||||
neither is not an option.
|
||||
|
||||
## B2-8 — The B2-tagged findings
|
||||
|
||||
Lands **before** B2-2; they touch the same replay/resume files.
|
||||
|
||||
| Finding | Area | Public summary |
|
||||
| ------- | ------------------- | --------------------------------------------------------------------------------------- |
|
||||
| OC-0311 | Client voice/E2EE | A leave from another readable voice channel can mutate the active call's peer-key state |
|
||||
| OC-0315 | Client replay | Replay-gate timestamps mix naive-UTC server values with local wall-clock parsing |
|
||||
| OC-0316 | Server/client E2EE | Resume restores peer public keys but not a room key rotated during the outage |
|
||||
| OC-0317 | Client DM state | Replay can regress a DM's `lastMessageId` |
|
||||
| OC-0318 | Server plugins | Install-time and restart-time manifest precedence differ between JSON and TOML |
|
||||
| OC-0322 | Client connection | TypeScript host validation accepts a hostname form the native proxy rejects |
|
||||
| OC-0328 | Client unread state | Channel badges lack the message-id replay guard DMs already have |
|
||||
| OC-0337 | Server replay | Cold-tier voice replay truncation can discard the newest events |
|
||||
| OC-0338 | Server plugins | TOML manifests can omit configured memory and CPU limits |
|
||||
|
||||
Run `bughunt-fix` on exactly these nine (test-first, per-file agents, one
|
||||
`ci-check` gate, one PR). A finding that turns out to need B7 (client
|
||||
platform seam) is re-tagged in the issue register with the reason, per the roadmap's
|
||||
phase execution pattern, not silently skipped.
|
||||
|
||||
## B2-9 — Security owners and acceptance tests
|
||||
|
||||
The seven local reports in `docs/security-findings/` (gitignored, never
|
||||
committed; the directory-to-row mapping lives in its local README) and
|
||||
where each goes:
|
||||
|
||||
| Public row | Owner phase | Acceptance test lives | Lands with |
|
||||
| ---------- | ------------------------------- | ---------------------------------------------------------------------------------------- | --------------------------------- |
|
||||
| S-01 | **B2** | beside the report until B2-5 merges | B2-5 |
|
||||
| SEC-02 | **B2** (server half) | beside the report until B2-5 merges | B2-5; UI half in B5 |
|
||||
| C-09 | **B2** (contract) / B7 (client) | beside the report | contract in B2-7 docs; code in B7 |
|
||||
| SEC-03 | B2 if small, else **B5** | beside the report | B2-9 or B5 item 11 |
|
||||
| SEC-01 | **B4** | private GitHub advisory (owner creates it) | B4 |
|
||||
| SEC-04 | **B3/B6** | private GitHub advisory (owner creates it) | B6 |
|
||||
| OC-0324 | **B4** | beside the report; no advisory — the tracked ledger already carries this finding in full | B4 |
|
||||
|
||||
An acceptance test demonstrates the defect, so it is exploit detail: it stays
|
||||
local until its fix lands, then lands publicly in the same PR. The two
|
||||
advisories (SEC-01, SEC-04) are created by the owner in the GitHub UI (Security → Advisories →
|
||||
New draft), not by CLI with the report text; their IDs are recorded in
|
||||
`docs/security-findings/README.md`, which is local. Public commits, issues and
|
||||
PR bodies never name the mechanism (`docs/security.md`).
|
||||
|
||||
## HP-2 — Protocol and threat-model sign-off
|
||||
|
||||
`docs/plans/hp-2-scorecard-<date>.md`, in the HP-1 shape. Questions it must
|
||||
answer with commands, not assertions:
|
||||
|
||||
1. Is the epoch wire frozen? Schema, generated constants, `auth`/`ready`/
|
||||
`auth_error` shapes, close code — with the pre-squash SHAs of B2-1's
|
||||
fixture commit and B2-2's negotiation commits.
|
||||
2. Does downgrade behave? The B2-4 matrix output for every epoch case.
|
||||
3. Are the trust claims true? `trust-model.md` reviewed by the owner and one
|
||||
non-developer; every claim traced to a test or a code line.
|
||||
4. Are the E2EE membership and key-change rules stated and tested? A table of
|
||||
rules with the test that pins each (identity TOFU, re-pin TOCTOU, rekey on
|
||||
leave, rotation during outage from OC-0316) — existing tests inventoried,
|
||||
missing adversarial cases added.
|
||||
5. Is there one predicate per property? The B2-5 inventory before and after:
|
||||
direct bit-helper calls outside `Server/permissions` → 0 or a listed
|
||||
residue with reasons.
|
||||
6. Are the deferred systems bounded? The absence test, the plugin document,
|
||||
and the configuration audit (WASM off in fresh, upgraded, Docker and
|
||||
standalone configurations).
|
||||
7. Is `dev` strict? The API read-back from B2-0.
|
||||
|
||||
The owner signs. Acceptance authorises B3 and claims nothing about beta
|
||||
readiness.
|
||||
|
||||
## Exit gate
|
||||
|
||||
The roadmap's seven conditions, plus two:
|
||||
|
||||
| # | Condition | Evidence |
|
||||
| --- | ------------------------------------------------------------------------------------------------------------------------------------- | ------------------------------------------ |
|
||||
| 1 | Clients from epochs N, N-1, N-2 pass the matrix; N-3 fails safely and actionably; the bundled browser client matches the server epoch | B2-4 output (browser client: n/a until B8) |
|
||||
| 2 | Protocol and update-metadata changes are generated, documented, and downgrade-tested | B2-2, B2-3, drift gate |
|
||||
| 3 | Effective-permission and resource-existence sibling cases have parity tests | B2-5 |
|
||||
| 4 | Voice/video/screen E2EE membership and key-change behaviour pass adversarial tests | HP-2 question 4 |
|
||||
| 5 | No central identity, directory, federation path, or required external service exists | B2-7 absence test + host table |
|
||||
| 6 | WASM disabled by default; release artifacts do not imply API stability | B2-7 plugin document + config audit |
|
||||
| 7 | No unresolved B2 security advisory remains | B2-9 table, B2-owned rows closed |
|
||||
| 8 | _(added)_ Epoch-1 fixtures were captured before the first protocol change, in a separate commit | B2-1 SHA precedes B2-2's |
|
||||
| 9 | _(added)_ Pre-squash SHAs recorded for the fixture and negotiation commits | HP-2 question 1 |
|
||||
|
||||
## Explicitly out of scope for B2
|
||||
|
||||
- The BPR-033 update experience (B7). B2 ships the frame and the "no reconnect
|
||||
loop" property only.
|
||||
- External-fetch policy beyond SEC-03's bounded reads (B5).
|
||||
- Any database, service or domain extraction (B3).
|
||||
- The client platform seam (`Client/src/platform/`, B7).
|
||||
- Re-tagging or fixing findings not tagged B2, other than as B2-8 records.
|
||||
|
||||
## Traps carried forward
|
||||
|
||||
- **Docker:** build context is `Server/`; compare `docker images --format '{{.Size}}'`
|
||||
(50.1 MB), not `docker image inspect` (12.5 MB); until B2-0 lands, set
|
||||
`MSYS_NO_PATHCONV=1` yourself.
|
||||
- **Squash merges hide structure.** Record `refs/pull/<n>/head` SHAs at merge
|
||||
time for every B2 PR a hold point will review.
|
||||
- **`check:docs` counts.** `docs/plans/README.md` is watched; never write two
|
||||
`<n> <status>` pairs on one line there unless they match the ledger.
|
||||
- **`strict: true` after B2-0:** every open PR needs "Update branch" after
|
||||
another merges. Keep one PR in flight per hot file.
|
||||
- **Schema edits go through the `protocol-change` skill**; `make` is not on
|
||||
PATH on Windows, so use `npm run generate` and `npm run check:server`.
|
||||
- **Never pass `-c user.email` to git.** The identity is configured.
|
||||
@@ -3,7 +3,12 @@
|
||||
**Prepared:** 2026-08-23
|
||||
**Audited head:** 5cc0888964e26276d1aca145e83270a2c1b9febd on dev
|
||||
**Release target:** first public beta after the 1.2.0-alpha line
|
||||
**Status:** proposed implementation sequence; no phase is complete yet
|
||||
**Status:** B0 and B1 complete (HP-0 accepted 2026-08-25, HP-1 accepted
|
||||
2026-08-27); B2 in progress from
|
||||
[b2-protocol-trust-compat-2026-08-28.md](b2-protocol-trust-compat-2026-08-28.md);
|
||||
B3–B10 not started. Amended 2026-08-28 — see the `_(added 2026-08-28)_` lines
|
||||
in B3–B10 and the "Phase execution pattern" section. [README.md](README.md) is
|
||||
the status authority when this header and a README row disagree.
|
||||
**Planning model:** quality-gated, with no calendar deadline
|
||||
|
||||
Primary inputs:
|
||||
@@ -43,6 +48,9 @@ change.
|
||||
## Current evidence snapshot
|
||||
|
||||
This is audit evidence, not a release claim. It must be refreshed in B0.
|
||||
_Superseded 2026-08-25 by
|
||||
[b0-baseline-2026-08-25.md](b0-baseline-2026-08-25.md), which holds the
|
||||
measured numbers. The table below is kept for the audit trail._
|
||||
|
||||
| Area | Evidence at the audited head | Consequence |
|
||||
| ------------------ | --------------------------------------------------------------------------------------------------------------------------------------------------------------- | ------------------------------------------------------------------------------------ |
|
||||
@@ -161,6 +169,29 @@ An item is done only when:
|
||||
- tracker, requirement map, and phase scorecard agree;
|
||||
- rollback, compatibility, and data-migration notes exist where applicable.
|
||||
|
||||
## Phase execution pattern
|
||||
|
||||
_Added 2026-08-28._ What B0 and B1 proved, written once so later phases do not
|
||||
rediscover it.
|
||||
|
||||
1. Each phase gets an execution plan, `docs/plans/bN-<slug>-<date>.md`, at its
|
||||
start, and a scorecard, `docs/plans/hp-N-scorecard-<date>.md`, at its hold
|
||||
point. The plan re-verifies this roadmap's claims against HEAD before
|
||||
implementing anything — B1 refuted several audit findings on contact — and
|
||||
records each verdict. [README.md](README.md) rows are the status authority;
|
||||
a plan header that disagrees with its README row is stale.
|
||||
2. A phase cannot exit while any `OC-*` finding tagged to it in the
|
||||
[issue register](repo-health-issue-register-2026-08-23.md) is open, unless
|
||||
the finding is re-tagged to a later phase with a written reason in the
|
||||
scorecard. The tags exist today; this rule is what enforces them, and it is
|
||||
what makes "zero open P0/P1 at B10" a measured fact rather than a hope.
|
||||
3. Record pre-squash pull-request SHAs at merge time whenever a hold point
|
||||
reviews commit structure. `dev` is squash-only, so a pure-move/rewrite or
|
||||
fixture/behaviour split survives only on `refs/pull/<n>/head`
|
||||
([hp-1-scorecard-2026-08-27.md](hp-1-scorecard-2026-08-27.md)).
|
||||
4. `dev` requires branches to be up to date before merging (`strict: true`,
|
||||
applied in B2-0). One pull request per plan step, branched from `dev`.
|
||||
|
||||
## B0 — Restore truth, freeze scope, and reconcile the audit
|
||||
|
||||
**Objective:** replace stale or contradictory status with one reproducible
|
||||
@@ -326,6 +357,9 @@ server services and clients must obey.
|
||||
**Primary requirements:** BPR-031, BPR-032, BPR-040, BPR-050, BPR-051, and
|
||||
BPR-080 through BPR-083.
|
||||
|
||||
**Execution plan** _(added 2026-08-28)_:
|
||||
[b2-protocol-trust-compat-2026-08-28.md](b2-protocol-trust-compat-2026-08-28.md).
|
||||
|
||||
### Entry gate
|
||||
|
||||
- B1 is complete and protocol source has one owner.
|
||||
@@ -435,6 +469,21 @@ for every later requirement.
|
||||
11. Establish performance baselines for permission invalidation, read-state
|
||||
writes, broadcast/replay, database waits, reconnect storms, and upload
|
||||
admission.
|
||||
12. _(added 2026-08-28)_ Build the alpha-shaped test dataset: a deterministic
|
||||
alpha-shape profile in `Server/cmd/seed` plus one anonymised
|
||||
`v1.2.0-alpha.4` database snapshot at a documented path. B4's HP-4 drills,
|
||||
B6's upgrade rehearsal and B10's in-place upgrade all consume it; until B3
|
||||
builds it, nobody owns it.
|
||||
13. _(added 2026-08-28)_ Workstreams 2 and 3 are the design already written in
|
||||
[bug-detection-improvements.md](bug-detection-improvements.md), Tiers 3a,
|
||||
3b and 3c. Execute that design; do not write another.
|
||||
14. _(added 2026-08-28)_ Workstream 1's coverage floor starts at B0's measured
|
||||
74.6% CI aggregate and ratchets from there.
|
||||
15. _(added 2026-08-28)_ Adopt an `authz-chokepoint` rule in
|
||||
`Server/invariants` only if B2-5's predicate inventory shows a mechanical
|
||||
shape. The rule was dropped once for lack of evidence; B2-5 produces it.
|
||||
16. _(added 2026-08-28)_ Run the Docker smoke nightly on `dev`. The CI job is
|
||||
`main`-gated, so `dev` never proves the image.
|
||||
|
||||
### Hold point HP-3 — First vertical-slice review
|
||||
|
||||
@@ -507,6 +556,13 @@ retained, and erasable without central services or misleading privacy claims.
|
||||
policies and attachment cleanup.
|
||||
12. Keep diagnostics local, make support-bundle export user initiated, and
|
||||
prevent automatic product or usage telemetry.
|
||||
13. _(added 2026-08-28)_ HP-4's destructive drills run against the B3
|
||||
alpha-shaped dataset, not ad-hoc copies.
|
||||
14. _(added 2026-08-28)_ OC-0321 is a must-close: a TOTP key-file read error is
|
||||
treated as absence and the key is replaced. Data-loss class.
|
||||
15. _(added 2026-08-28)_ Workstream 7 is smaller than written: per-session
|
||||
listing and individual revocation already exist server-side. B4 adds the
|
||||
new-login event and sign-out-everywhere only.
|
||||
|
||||
### Hold point HP-4 — Irreversible-data review
|
||||
|
||||
@@ -586,6 +642,9 @@ operation before building their full cross-client experience.
|
||||
rotation, and stale-subscription cleanup. There is no OwnCord relay.
|
||||
10. Keep automation optional. Human moderation authority and audit remain core
|
||||
even if automation becomes a post-beta plugin candidate.
|
||||
11. _(added 2026-08-28)_ SEC-03 (bounded per-response and aggregate
|
||||
preview/media reads) is first in line unless B2-9 already landed it. It is
|
||||
P1 and confirmed.
|
||||
|
||||
### Hold point HP-5 — Abuse and privacy review
|
||||
|
||||
@@ -670,6 +729,21 @@ service.
|
||||
SBOM, provenance, checksums, and source-snapshot evidence.
|
||||
12. Document local logs, support-bundle generation, capacity limits, ports,
|
||||
storage growth, certificate trust, recovery, updates, and safe failure.
|
||||
13. _(added 2026-08-28)_ Must-close before any ARM64 server asset ships:
|
||||
OC-0320 (self-update selects linux-amd64 regardless of architecture),
|
||||
OC-0332 (a bare IPv6 address breaks the updater URL), OC-0344 (the
|
||||
HTTP→HTTPS redirect assumes port 443) and OC-0339 (an empty configuration
|
||||
section is reported as unknown).
|
||||
14. _(added 2026-08-28)_ The 250/100/25 run starts from
|
||||
`Server/scripts/k6/ws-load.js`. k6 cannot drive voice; a 25-participant
|
||||
LiveKit load harness is a real gap and needs a named owner before HP-6.
|
||||
15. _(added 2026-08-28)_ R-09: the exact-SHA gate already runs at tag time
|
||||
(the `gate-evidence` job in `release.yml`, B1-7); `environment: release`
|
||||
lands in B2-0. B6 rehearses one tag against both before HP-6.
|
||||
16. _(added 2026-08-28)_ Add the browser-hosting flag to
|
||||
`GET /api/v1/server-info` (defined in B2-2) alongside workstream 6's
|
||||
default-off hosting switch, so one endpoint answers "what is this
|
||||
server, and is the browser client on".
|
||||
|
||||
Public IP certificates are feasible only for eligible stable public addresses
|
||||
and currently require short-lived certificate handling. Private or reserved IP
|
||||
@@ -758,6 +832,14 @@ without regressing the current application.
|
||||
disclosure, and local support-bundle export.
|
||||
12. Build and smoke Windows x64/ARM64 and Linux x64/ARM64 desktop artifacts,
|
||||
using native Windows ARM64 evidence and declared Linux ARM64 evidence.
|
||||
13. _(added 2026-08-28)_ Delete the two Rust commands nothing invokes,
|
||||
`probe_credential_store` and `ptt_get_key`
|
||||
([platform-contracts.md](../architecture/platform-contracts.md)).
|
||||
14. _(added 2026-08-28)_ Workstream 8 consumes B2's
|
||||
`protocol_epoch_unsupported` frame and `GET /api/v1/server-info`; it
|
||||
defines no new contract.
|
||||
15. _(added 2026-08-28)_ Re-run Stryker (C-16) before workstream 6 decomposes
|
||||
modules, so the mutation baseline is honest.
|
||||
|
||||
### Hold point HP-7 — Desktop parity before browser behavior
|
||||
|
||||
@@ -835,6 +917,13 @@ behavior.
|
||||
real supported browsers/devices for release qualification.
|
||||
10. Preserve one active server connection and per-server account/profile
|
||||
isolation.
|
||||
11. _(added 2026-08-28)_ No certificate pinning in a browser. Workstream 7's
|
||||
LAN/offline path uses publicly trusted or local-CA certificates only —
|
||||
never a TOFU shim ([platform-contracts.md](../architecture/platform-contracts.md),
|
||||
hard case one).
|
||||
12. _(added 2026-08-28)_ The browser client reads `GET /api/v1/server-info`
|
||||
(B2-2, flag from B6) for the hosting flag and epoch; no separate
|
||||
discovery endpoint.
|
||||
|
||||
Service workers, camera/microphone, Web Push, and screen capture require secure
|
||||
contexts in normal browser use. The plan follows the relevant
|
||||
@@ -1004,6 +1093,11 @@ re-verifies every BPR.
|
||||
accessibility, support, feedback, and contribution documentation.
|
||||
12. Prepare safe release notes and coordinated fixed-vulnerability disclosure.
|
||||
Do not publish private exploit material by default.
|
||||
13. _(added 2026-08-28)_ `ci.yml` cancels in-progress runs on every ref,
|
||||
`main` included, so item 2's thirty consecutive runs cannot be counted as
|
||||
written. Exempt `main` from `cancel-in-progress` before the count starts.
|
||||
14. _(added 2026-08-28)_ The 14-day soak runs on named hosts: the owner's LAN
|
||||
self-hosted instance and one Docker instance.
|
||||
|
||||
### Hold point HP-10 — Human go/no-go
|
||||
|
||||
@@ -1103,17 +1197,25 @@ Every hold point and phase exit records at least:
|
||||
The actual values and links belong in phase evidence, not as optimistic edits
|
||||
to this plan.
|
||||
|
||||
## First implementation slice
|
||||
## Current implementation slice
|
||||
|
||||
Start with B0 only:
|
||||
_Updated 2026-08-28._ B0 and B1 are complete (HP-0 accepted 2026-08-25, HP-1
|
||||
accepted 2026-08-27). The active slice is B2, executed from
|
||||
[b2-protocol-trust-compat-2026-08-28.md](b2-protocol-trust-compat-2026-08-28.md)
|
||||
in this order:
|
||||
|
||||
1. repair the two failing Vitest contracts;
|
||||
2. make Playwright terminate reliably;
|
||||
3. collect matched server lint and Docker evidence;
|
||||
4. finish issue/security/requirement reconciliation;
|
||||
5. run the exact-SHA full matrix and publish the non-sensitive baseline
|
||||
scorecard.
|
||||
1. B2-0 — alpha.4 verified, `dev` synced with `main`, release hygiene, `dev`
|
||||
set to `strict: true`;
|
||||
2. B2-1 — epoch-1 fixtures captured **before** any protocol change;
|
||||
3. B2-8 — the B2-tagged findings, because they touch the same replay/resume
|
||||
files as B2-2;
|
||||
4. B2-2 → B2-3 → B2-4, serialized;
|
||||
5. B2-6, B2-7 and B2-9 in parallel where the plan allows; B2-5 is serialized.
|
||||
|
||||
Then execute the B1 structural work as isolated changes. Do not begin server
|
||||
feature implementation, client architecture extraction, or browser work before
|
||||
those two gates close.
|
||||
Do not begin B3 domain extraction, client platform extraction, or browser work
|
||||
before HP-2 closes.
|
||||
|
||||
The original 2026-08-23 slice (B0 only, then B1 as isolated changes) was
|
||||
executed as written; see
|
||||
[b0-baseline-2026-08-25.md](b0-baseline-2026-08-25.md) and
|
||||
[b1-repository-foundation-2026-08-25.md](b1-repository-foundation-2026-08-25.md).
|
||||
|
||||