* feat(service): settings family — SettingsService over the Store seam The B3-8 settings/audit family's service: List, Patch (whitelist, boolean normalization, the require_2fa preconditions incl. the TOTP census and the unrelated-key guard, atomic apply, one audit row per changed key) and Setting (the read the hub and the backup scheduler consume; wraps db.ErrNotFound as the store reports it). db gains ApplySettings — the handler's raw upsert loop as one hand-written transactional wrapper where raw SQL belongs — and Store carries it. parseSettingsPatchBool duplicates auth.go's parseBooleanSettingValue with the admin surface's own pinned error wording; both messages are test-pinned, so the twins stay separate. Service-level characterization in settings_test.go mirrors the admin/api_test.go PATCH rows and adds the service-only contracts (ErrNotFound wrap, audit rows, multi-key apply). Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01B8dwVLEihnGZYtH9X631F4 * refactor(admin): settings handlers thin over SettingsService; scheduler reads via it handleGetSettings/handlePatchSettings become adapters (decode, delegate, map ErrBadRequest to 400 with the service's prefix-free message); the whitelist and every precondition now live only in the service, so admin/types.go's copy is gone. MaintainBackups reads backup_schedule and backup_retention through the service — its backup mechanics keep the handle — and the maintenance chain threads Settings from the runtime the hub stage built. NewHandler/NewAdminAPI gain the settings parameter; all 207 construction sites wired via the newTestSettingsService helper. Behavior parity pinned by the existing TestAdminAPI_*Settings* rows (all green); the only unpinned change is the PATCH 500 path collapsing its four stage-specific internal messages into one. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01B8dwVLEihnGZYtH9X631F4 * refactor(ws): hub settings cache reads through a SettingsReader The hub's server_name/motd cache consumes a consumer-side SettingsReader interface (service.SettingsService satisfies it; HubOptions.Settings is required and validated like DB and Limiter — the RequiredCollaborators pin gains the refusal case). hub_settings.go no longer touches db at all, so the import pin from the B3-5 finisher goes, and its allowlist row goes with it; the thinned admin settings handler's row is deleted too — two allowlist rows down, the settings family's persistence now lives only in db/ and service/. Test helpers (both ws package namespaces) default the reader over the test database; newBareHub wires it explicitly; production passes Services.Settings from StartRuntime. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01B8dwVLEihnGZYtH9X631F4 * docs(boundaries,b3): settings/audit family re-measure and evidence The backup pair takes its forecast boundary disposition; the family's two deleted rows and the disposition counts (28/18/15 -> 24/18/17) re-derived from the tool. Family evidence block appended to the B3-8 section; README B3 row records B3-5 complete and the family opened. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01B8dwVLEihnGZYtH9X631F4 * fix(service): prefix-free ErrBadRequest wraps for the pinned admin bodies The %.0w rework was meant to ride the service commit but was left unstaged: with the plain %w wrap the PATCH error bodies carry a 'bad request: ' prefix the admin pins reject. Zero-width wrapping keeps errors.Is(ErrBadRequest) while err.Error() stays exactly the pinned message. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01B8dwVLEihnGZYtH9X631F4 * test(app): lifecycle hub fixtures wire the required Settings reader The two direct ws.NewHub sites in lifecycle_test predate Settings becoming required; race across internal/app is green again. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01B8dwVLEihnGZYtH9X631F4 * test(db): cover ApplySettings — the db coverage floor caught the gap CI's coverage floor failed db at 78.9% against 79.3%: ApplySettings was exercised only from service tests, which do not count toward db's own figure. Four db-side rows cover the apply, the empty no-op, the in-transaction failure rollback and the begin failure, using the package's full-migration opener. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01B8dwVLEihnGZYtH9X631F4 * chore(coverage): raise the service floor to the branch's measured 69.2 The settings family's tested service code raised the Linux figure from the 67.8 floor to 69.2; the ratchet raises the floor in the same PR (service is not in the run-varying set). db stays at 79.3 — this PR restores its figure (79.5 with the ApplySettings tests), it did not set out to raise it. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01B8dwVLEihnGZYtH9X631F4 --------- Co-authored-by: Claude <noreply@anthropic.com>
26 KiB
Plan index
Closes G-04. Historical plans are kept at their existing paths — links from audits and commit messages must keep resolving — so status is recorded here rather than by moving or rewriting them.
A plan's own header can drift out of date after its table is updated in place. Where that has happened it is called out below, and this index is the authority.
Active — these drive current work
| Plan | State |
|---|---|
| beta-product-requirements-2026-08-23 | Approved beta scope, frozen. 57 BPR-* requirements. Amended 2026-08-31: BPR-032 reworded to the slim single-current-epoch policy (owner decision; the scope HP-2 accepted). |
| repo-health-roadmap-2026-08-23 | Phase order and gates, B0–B10. B0, B1 and B2 complete (HP-0, HP-1 and HP-2 all accepted); B3 in progress — the B3 plan row below tracks it. B4–B10 not started. Amended 2026-08-28: dated lines in B3–B10, a "Phase execution pattern" section, and a truthful status header. Amended 2026-08-29: B3/B7/B9 lines binding the layout-refactor supplement below; current slice updated for B2-2. Amended 2026-08-31: B1 exit reworded to identical-tree integration evidence; B6/B8/B10 server-info and epoch-window lines aligned with the B2-2 slim decision; B10 gains the BPR-051 comprehension-read row (owner decisions 2026-08-31). |
| repo-health-issue-register-2026-08-23 | 116 planning rows. Public-safe; not a replacement for the ledger. Amended 2026-08-31: OC-0349–0375 and OC-0379 enumerated with owner-approved phases; G-03 closure evidence reworded to identical-tree integration evidence; BG-07 re-scoped to BPR-032 as amended. |
| beta-requirements-traceability-2026-08-23 | Requirement → phase → evidence map. No row is release-qualified. |
| b0-baseline-2026-08-25 | Supersedes the roadmap's "current evidence snapshot." B0 measurements and dispositions. |
| b1-repository-foundation-2026-08-25 | B1-0 through B1-8 all done. B1 execution plan. Re-verifies every RL-* claim against HEAD; several are refuted. |
| hp-0-scorecard-2026-08-25 | HP-0 accepted 2026-08-25. The single baseline-acceptance artifact. Part-closes R-08. |
| hp-1-scorecard-2026-08-27 | HP-1 accepted 2026-08-27. Structural-diff proofs for the flatten and module rename, plus the B1 exit gate. |
| b2-protocol-trust-compat-2026-08-28 | B2 complete — HP-2 accepted 2026-08-29. B2-0, B2-1, B2-8 done 2026-08-28; B2-2 (B2-3/B2-4 folded in), B2-5, B2-6, B2-7, B2-9 done 2026-08-29. Scorecard below. |
| hp-2-scorecard-2026-08-29 | HP-2 accepted 2026-08-29. Seven questions answered with commands; B2 exit gate, nine conditions met (1 at the slim epoch scope, 4 with one E2EE gap disclaimed). Owner follow-ups that do not gate B3: BPR-051 reader line, SEC-01/SEC-04 advisory IDs. |
| b3-server-architecture-guardrails-2026-08-29 | B3 in progress from 2026-08-29. Execution plan: B3-0 inventory → B3-1/B3-2 auth slice → HP-3 → lifecycle, hub options, ws split, families; guardrails and the alpha dataset beside the slice. B3-0 (inventory + db-import-boundary rule) and B3-1 (auth characterization) merged 2026-08-29; B3-2 (auth vertical slice) merged 2026-08-30; B3-9 (five of the six B3-tagged findings; OC-0323 rides B3-8) merged 2026-08-30; HP-3 accepted 2026-08-30; B3-3 (lifecycle extraction into Server/internal/app/) merged 2026-08-30 (#1464); B3-4 (hub constructor options) merged 2026-08-31 (#1470); B3-7 (deterministic alpha dataset) merged 2026-08-31 (#1469); B3-5 (ws split) in progress — split PR 1 (handshake auth + fresh-connect) merged 2026-08-31 (#1472); split PR 2 (replay family + connection registry) merged 2026-08-31 (#1473); split PR 3 (visibility gather) merged 2026-08-31 (#1474); split PR 4 (voice leftovers + presence coalescer) merged 2026-08-31 (#1475); finisher merged 2026-08-31 (#1476) — B3-5 complete, all seven responsibilities and all three size targets; B3-8 in progress — settings/audit family (first of seven) opened 2026-08-31. |
| hp-3-scorecard-2026-08-29 | HP-3 accepted 2026-08-30 by the owner. Five questions on the auth vertical slice answered with commands: frozen set green at every pre-squash SHA, api db importers 12 → 10, B2 contracts unchanged, the pattern written as D4 in server.md, guardrails as they exist. |
| b3-bench-baseline-2026-08-30 | Recorded 2026-08-30, not gated. The six B3-6 Benchmark* through benchstat at ec8ef24a, produced by make bench-baseline. Nothing in CI reads these numbers; the performance gate is B6's. Regenerating writes a new dated file — replace this row and delete the superseded document, so only the newest baseline is kept. |
| audit-2026-08-19-remediation | Phases 1–6 done 2026-08-20; phase 7 pending. Its header still reads "in progress 2026-08-19" — stale; the phase table is correct. |
Partially implemented
| Plan | State |
|---|---|
| bug-detection-improvements | Tier 1a (make fuzz) and Tier 2 (five ESLint rules) shipped 2026-08-08. Remaining tiers open. |
Design only — not implemented
| Plan | State |
|---|---|
| developer-experience-layout-refactor-2026-08-29 | Draft, not started. Implementation supplement bound into the roadmap 2026-08-29: B3 workstream 17 (Phases 1–3, auth slice → HP-3), B7 workstream 16 (Phases 4–6), B9 workstream 11 (CSS split). Nothing starts before HP-2. |
| slash-commands | Design only. No implementation; not in beta scope. |
Shipped — kept for history, do not use as current status
| Plan | Shipped |
|---|---|
| audit-2026-07-19-decisions | Decisions recorded; greenlit items implemented through 2026-07-23. |
| channel-visibility-unification | 2026-07-20 (D9), re-verified 2026-08-04. |
| v2-dispatch-migration | 2026-07-20 (D10), re-verified 2026-08-04. |
| tauri-capability-narrowing | 2026-07-20, re-verified 2026-08-04. |
| http-tofu-proxy | 2026-07-19, re-verified 2026-08-04. |
| permission-middleware-consolidation | 2026-07-23 (D13), re-verified 2026-08-04. |
| security-hardening-remediation | 2026-07-23, re-confirmed 2026-08-04. |
| security-scan-2026-07-22-remediation | All 8 findings F1–F8 closed, verified 2026-08-04. |
| sqlc-adoption | Shipped, verified 2026-08-04. |
| discord-parity | Phases 1–6 complete, verified 2026-08-04. Phase 1's table reads as a gap list but every row shipped. |
| infrastructure-roadmap | 2026-08-15, with two recorded leftovers (TOTP persister seam; published capacity numbers). |
Where status actually lives
Planning documents are not trackers. Do not read a defect count out of one.
| Concern | Source of truth |
|---|---|
| Defect status | .superpowers/findings-ledger.json (FINDINGS.md is rendered from it) |
| Security-sensitive defects | Private GitHub Security Advisories |
| Product scope | beta-product-requirements-2026-08-23 |
| Phase order and gates | repo-health-roadmap-2026-08-23 |
| Current measured baseline | b0-baseline-2026-08-25 |
Ledger at 2026-08-31: 321 fixed / 54 open / 3 declined / 1 duplicate = 379
(B3-9, PR #1454, closed the five B3-tagged records; OC-0379 records and fixes
OC-0345's leftover role re-read).
The 2026-08-25 sweep resolved every record then open to a live file:line at
5cc0888964e26276d1aca145e83270a2c1b9febd — a manual pass, not something a
command reproduces, and not repeated for records opened since. What the
tooling does check:
node .superpowers/render-ledger.mjs --check # the ledger's schema is valid
node scripts/check-doc-counts.mjs # documents agree with it, and
# FINDINGS.md is not stale
Adding a plan
- Give it a
**Status:**line with a date, and update that line — not only the phase table — when it changes. - Add a row here. A plan absent from this index has no recorded status.
- Mark a superseded plan here; leave it at its path so existing links resolve.