OwnCord/docs/plans/README.md
T
J3vbandClaude Fable 5 2a21a22ecb docs(plans): bind the layout-refactor supplement into B3/B7/B9 and record B2-2 done (#1439)
Adds docs/plans/developer-experience-layout-refactor-2026-08-29.md and wires
it into the roadmap as dated workstream lines (B3 #17, B7 #16, B9 #11) rather
than a new phase. Updates the current implementation slice and README rows
for B2-2 (PR #1438, B2-3/B2-4 folded in; B2-5 next) and fixes the new plan's
stale pending-merge header.


Claude-Session: https://claude.ai/code/session_01Rg9QQWVN3E5UUgBD2dydtu

Co-authored-by: Claude Fable 5 <noreply@anthropic.com>
2026-08-29 05:51:24 +00:00

84 lines
12 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Plan index
Closes G-04. Historical plans are kept at their existing paths — links from
audits and commit messages must keep resolving — so status is recorded **here**
rather than by moving or rewriting them.
A plan's own header can drift out of date after its table is updated in place.
Where that has happened it is called out below, and **this index is the
authority**.
## Active — these drive current work
| Plan | State |
| ----------------------------------------------------------------------------------------- | -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| [beta-product-requirements-2026-08-23](beta-product-requirements-2026-08-23.md) | Approved beta scope, frozen. 57 `BPR-*` requirements. |
| [repo-health-roadmap-2026-08-23](repo-health-roadmap-2026-08-23.md) | Phase order and gates, B0B10. **B0 and B1 complete** (HP-0 and HP-1 both accepted); **B2 in progress** — plan below. B3B10 not started. **Amended 2026-08-28:** dated lines in B3B10, a "Phase execution pattern" section, and a truthful status header. **Amended 2026-08-29:** B3/B7/B9 lines binding the layout-refactor supplement below; current slice updated for B2-2. |
| [repo-health-issue-register-2026-08-23](repo-health-issue-register-2026-08-23.md) | 88 planning rows. Public-safe; not a replacement for the ledger. |
| [beta-requirements-traceability-2026-08-23](beta-requirements-traceability-2026-08-23.md) | Requirement → phase → evidence map. No row is release-qualified. |
| [b0-baseline-2026-08-25](b0-baseline-2026-08-25.md) | **Supersedes the roadmap's "current evidence snapshot."** B0 measurements and dispositions. |
| [b1-repository-foundation-2026-08-25](b1-repository-foundation-2026-08-25.md) | **B1-0 through B1-8 all done.** B1 execution plan. Re-verifies every RL-\* claim against HEAD; several are refuted. |
| [hp-0-scorecard-2026-08-25](hp-0-scorecard-2026-08-25.md) | **HP-0 accepted 2026-08-25.** The single baseline-acceptance artifact. Part-closes `R-08`. |
| [hp-1-scorecard-2026-08-27](hp-1-scorecard-2026-08-27.md) | **HP-1 accepted 2026-08-27.** Structural-diff proofs for the flatten and module rename, plus the B1 exit gate. |
| [b2-protocol-trust-compat-2026-08-28](b2-protocol-trust-compat-2026-08-28.md) | **B2 in progress from 2026-08-28.** B2-0, B2-1, B2-8 done 2026-08-28; B2-2 done 2026-08-29 (PR #1438, B2-3 and B2-4 folded in). **B2-5 is next**, serialized; B2-6/7/9 in parallel. Ends at HP-2. |
| [audit-2026-08-19-remediation](audit-2026-08-19-remediation.md) | Phases 16 done 2026-08-20; **phase 7 pending**. Its header still reads "in progress 2026-08-19" — stale; the phase table is correct. |
## Partially implemented
| Plan | State |
| ----------------------------------------------------------- | ---------------------------------------------------------------------------------------------- |
| [bug-detection-improvements](bug-detection-improvements.md) | Tier 1a (`make fuzz`) and Tier 2 (five ESLint rules) shipped 2026-08-08. Remaining tiers open. |
## Design only — not implemented
| Plan | State |
| ----------------------------------------------------------------------------------------------------- | --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| [developer-experience-layout-refactor-2026-08-29](developer-experience-layout-refactor-2026-08-29.md) | Draft, not started. Implementation supplement bound into the roadmap 2026-08-29: B3 workstream 17 (Phases 13, auth slice → HP-3), B7 workstream 16 (Phases 46), B9 workstream 11 (CSS split). Nothing starts before HP-2. |
| [slash-commands](slash-commands.md) | Design only. No implementation; not in beta scope. |
## Shipped — kept for history, do not use as current status
| Plan | Shipped |
| ------------------------------------------------------------------------------- | ---------------------------------------------------------------------------------------------------- |
| [audit-2026-07-19-decisions](audit-2026-07-19-decisions.md) | Decisions recorded; greenlit items implemented through 2026-07-23. |
| [channel-visibility-unification](channel-visibility-unification.md) | 2026-07-20 (D9), re-verified 2026-08-04. |
| [v2-dispatch-migration](v2-dispatch-migration.md) | 2026-07-20 (D10), re-verified 2026-08-04. |
| [tauri-capability-narrowing](tauri-capability-narrowing.md) | 2026-07-20, re-verified 2026-08-04. |
| [http-tofu-proxy](http-tofu-proxy.md) | 2026-07-19, re-verified 2026-08-04. |
| [permission-middleware-consolidation](permission-middleware-consolidation.md) | 2026-07-23 (D13), re-verified 2026-08-04. |
| [security-hardening-remediation](security-hardening-remediation.md) | 2026-07-23, re-confirmed 2026-08-04. |
| [security-scan-2026-07-22-remediation](security-scan-2026-07-22-remediation.md) | All 8 findings F1F8 closed, verified 2026-08-04. |
| [sqlc-adoption](sqlc-adoption.md) | Shipped, verified 2026-08-04. |
| [discord-parity](discord-parity.md) | Phases 16 complete, verified 2026-08-04. Phase 1's table reads as a gap list but every row shipped. |
| [infrastructure-roadmap](infrastructure-roadmap.md) | 2026-08-15, with two recorded leftovers (TOTP persister seam; published capacity numbers). |
## Where status actually lives
Planning documents are not trackers. Do not read a defect count out of one.
| Concern | Source of truth |
| -------------------------- | ------------------------------------------------------------------------------- |
| Defect status | `.superpowers/findings-ledger.json` (`FINDINGS.md` is rendered from it) |
| Security-sensitive defects | Private GitHub Security Advisories |
| Product scope | [beta-product-requirements-2026-08-23](beta-product-requirements-2026-08-23.md) |
| Phase order and gates | [repo-health-roadmap-2026-08-23](repo-health-roadmap-2026-08-23.md) |
| Current measured baseline | [b0-baseline-2026-08-25](b0-baseline-2026-08-25.md) |
Ledger at 2026-08-25: **315 fixed / 30 open / 3 declined / 1 duplicate = 349**.
All 38 open records still resolved to a live `file:line` at
`5cc0888964e26276d1aca145e83270a2c1b9febd` when that sweep was run — it was a
manual pass, not something a command reproduces. What the tooling does check:
```
node .superpowers/render-ledger.mjs --check # the ledger's schema is valid
node scripts/check-doc-counts.mjs # documents agree with it, and
# FINDINGS.md is not stale
```
## Adding a plan
1. Give it a `**Status:**` line with a date, and update that line — not only
the phase table — when it changes.
2. Add a row here. A plan absent from this index has no recorded status.
3. Mark a superseded plan here; leave it at its path so existing links resolve.